San Francisco · Generator Installation & Repair

Daly City Generators

Standby power for Westlake and Serramonte homes on lots where the side yard is four feet wide. Licensed C-10, permits pulled, free estimate.

Daly City Generators

Daly City · Generator Installation & Repair

Tight Lots, Thick Fog And A Whole Lot Of Doelger Houses

Daly City is a placement problem more than an electrical one. Most of the housing stock west of Mission Street is Doelger and Doelger-adjacent, built shoulder to shoulder in the fifties with garages at grade and side yards you can touch both walls of. A five-foot separation from an openable window is easy to state and hard to find, so on more than half the jobs here the answer is a slab at the back of the lot with a conduit run under the garage rather than the obvious spot next to the meter. We would rather spend an hour on that on the estimate visit than discover it on installation morning.

The good news is the gas. PG&E mains run everywhere in Daly City, the meters are usually accessible from the front or the side, and a natural gas air-cooled unit means no fuel to store, no fuel to go stale and no annual delivery to schedule. For a typical three-bedroom on the Westlake grid a 14kW to 18kW set covers the furnace, the fridge, the internet, the lights and one of the two bathrooms comfortably, and a whole house generator in the 22kW to 26kW range covers the entire panel including the electric range if the house has one.

The fog is not a joke either. Salt-bearing marine air comes over the ridge from Pacifica most afternoons and it sits on equipment. Enclosures that are fine in Walnut Creek show corrosion on the hinges and the exhaust shroud here inside three years if nobody looks at them, which is why the generator maintenance service we run on Daly City units includes hardware and enclosure inspection rather than just an oil change and a load test.

Commercially, the corridor along John Daly and Mission and the Serramonte retail edge is mostly restaurants, medical suites and small groceries, which means walk-in coolers and point-of-sale rather than data. Those buildings usually want a 30kW to 60kW commercial generator on an automatic transfer switch sized to the kitchen and refrigeration load, not the whole service. If the outage is planned and short, a rental generator parked in the lot for the day is often the cheaper answer, and we will say so.

Generators in Daly City

Generator Services In Daly City

Everything we install, service and rent in Daly City, dispatched from our shop in San Francisco.

🏠

Whole House Generators

Permanently installed natural gas standby units that carry the whole panel, start themselves within seconds of an outage and shut down when utility power returns.

Whole House Generators

🔌

Backup Generators

Portable and critical-load standby units that keep the heat, the fridge, the internet and the medical equipment running when the grid drops.

Backup Generators

🏭

Industrial Generators

Diesel and gas sets from 150kW to over a megawatt for manufacturing, cold storage, research and process loads that cannot be interrupted.

Industrial Generators

🏢

Commercial Generators

Standby units from 40kW to 150kW for restaurants, clinics, offices, retail and small industrial, wired to an automatic transfer switch and kept on a service plan.

Commercial Generators

🔧

Generator Repair

Diagnosis and repair on any make, plus scheduled servicing, oil changes and load testing to stop the failure happening in the first place.

Generator Repair

🚛

Generator Rentals

Towable and skid-mounted units from 20kW to 500kW for construction, events, film and emergency cover, delivered, connected and collected.

Generator Rentals

Frequently Asked Questions

What size generator do I need for my home?

It comes off a load calculation at your panel, not off the square footage. A typical San Francisco house with gas heat and a gas range is comfortable on 14kW to 18kW. Houses with a heat pump, an induction range or an EV charger generally need 22kW to 26kW. Anything above that moves into liquid-cooled equipment and a different price class. We measure what is actually connected before quoting a size.

What is the difference between a portable and a standby generator?

A portable is wheeled out, started and refuelled by hand, runs on gasoline or propane, and feeds a few circuits through a cord or an inlet box. A standby unit is bolted to a pad, plumbed into natural gas, starts itself about ten seconds into an outage with nobody home, and feeds whatever the transfer switch is wired to. The deciding question is usually whether somebody will reliably be there to operate it.

Which fuel is best — natural gas, propane or diesel?

For a home in San Francisco, natural gas, almost always: the main is already there, nothing is stored, nothing goes stale and runtime is unlimited. Propane is the answer where gas service is genuinely absent, at roughly a ten percent power penalty and with a tank to refill. Diesel belongs on commercial and industrial sites, where its power density and on-site fuel are worth the storage, noise and emissions obligations.

Which generator brands do you install and service?

We install and warranty Generac, Kohler, Cummins and Champion generators, and we service those plus Honda, Briggs and Stratton, Onan and most older equipment still running behind Bay Area buildings. Generac has the deepest parts network locally, Kohler runs quieter for the same output, Cummins suits commercial and larger loads, and Champion is the value option for a modest house.

How much does a whole house generator cost installed?

Between about $5,000 and $15,000 in this market, permitted and commissioned. The low end is a 14kW air-cooled unit with a critical-loads transfer switch, a short gas run and an easy pad. The high end is a 26kW unit with a 200-amp service switch, a long upsized gas line and a service upgrade first. Our number includes permits, commissioning and the first year of maintenance.

How long does a generator installation take?

Three to six weeks from order to running. Equipment lead time on common air-cooled sizes is one to three weeks and the permit runs alongside it. The install itself is one long day for a straightforward job, two if a service upgrade or an awkward gas run is involved, and inspection follows within a week or two depending on the jurisdiction.

Do I need a permit to install a generator?

Yes, everywhere we work. A standby install needs an electrical permit and a mechanical or plumbing permit for the gas connection, and the finished work is inspected. Several jurisdictions also check placement against setback and noise rules. We pull the permits and meet the inspector, because an unpermitted generator turns into an expensive discovery during escrow.

What does an automatic transfer switch do?

It watches utility voltage, and when the grid drops it disconnects your building from the utility, starts the generator and connects the building to it — usually within ten seconds. When utility power returns and holds, it transfers back and runs the engine down on a cooldown cycle. The utility disconnect is the critical part: it is what stops your generator energizing the line outside and injuring somebody working on it.

Where does the generator have to sit on my property?

Outside, on level ground, away from openable windows, doors and vents, clear of the property line, with the manufacturer’s clearance on every side for airflow and service access. Five feet from openings and eighteen inches from the wall is the common rule of thumb, but the binding numbers come from the equipment listing and local code — and on tight city lots that combination often rules out the obvious spot next to the meter.

How loud is a standby generator?

Roughly 60 to 70 decibels at seven metres for a modern air-cooled unit, which sits between a normal conversation and a window air conditioner. Kohler units and enclosed liquid-cooled sets are at the quieter end, and sound-attenuated enclosures exist for commercial machines in mixed-use blocks. The weekly exercise run lasts about twelve minutes and can be scheduled for a reasonable hour.

How often does a generator need servicing?

A home standby unit wants a full service once a year — oil and filter, air filter, plugs, belts, hoses, battery test, coolant, and a run under load — plus the weekly exercise cycle the controller does by itself. Commercial sets want a minor service twice a year and a major service annually, and anything on a critical load should also get a load-bank test each year.

How long will a generator run continuously?

A natural gas standby unit runs indefinitely while the gas main is live, which is why it is the default in this city. A diesel set runs as long as its tank lasts, typically a day or two on a sub-base tank before refuelling. A propane unit depends on tank size. A gasoline portable manages eight to twelve hours per tank and has to be refuelled by hand.

Does a generator add value to my home?

Generally yes, and in outage-prone parts of the Bay Area it is one of the improvements buyers actively look for. Industry surveys put the effect at around three to five percent of home value, and appraisers treat a permitted, professionally installed unit as a permanent improvement rather than a maintenance liability. The permitted part is what makes the difference.

Can I finance a generator installation?

Yes. Most customers use manufacturer-backed financing through the Generac or Kohler programs, a home improvement loan, or a HELOC, and the monthly figure on a typical whole-house install lands in the same range as a phone bill. We will break the quote into equipment, electrical and permit lines so a lender can see precisely what is being financed.

See all FAQs →

Need a generator in San Francisco?

Tell us the address and what has to stay running, and we will come back the same day with a free estimate and one fixed price.

Or call us now: (415) 818-1837

Get a Free Quote

By submitting, you agree to be contacted about your project. We respect your privacy.